Olympic Ink Factory - Nigeria

Ink Production Factory

Olympic Ink Factory

Dalal Steel Industries completes the reputable Olympic Ink Factory in Sango Otta, Nigeria. A factory designed for a ink production line - whereby it has a 21 meter tower and 4 mezzanines with round passages to receive heavy tanks.

The building was structurally designed and manufactured by Dalal Steel Industries using Pre-Engineered Steel Building Technology. With fast production and construction time the building was operational in no time.


Height

21m

Width x Length

36 x 48 meters

Project Location

Sango Otta - Nigeria

Materials Used

PEB Steel Structure


Covered Area

1,728 m² 

Building usage

Ink Production Line


The building was steel building was built in extension to an existing facility to increase production capabilities.

A Closer Look

The steel building has multiple mezzanines and a 21 meter tower.

The Exterior

Fully cladded with Aluzinc sheeting to fit the overall aesthetic needed.

Another View

Steel pre-engineering frames put together easily with bolted connections for fast assembly.

Speak to a Representative.

Contact our team to find the right solution for you.

September 26, 2022
Share this post
Archive
Trikkis Glass Factory - Cyprus
Pre-Engineered Steel Building Glass Factory in Cyprus
PUTTING OUR EXPERIENCE TO WORK FOR YOU
85
Meter clear span
90,000
Square meters for a single building
60
Countries
10,000
Steel buildings